Constraint Satisfaction
SolverForge solves constraint satisfaction and optimization problems (CSPs). This page explains the core concepts.
Problem Structure
Every planning problem has:
Planning Entities
Objects that the solver modifies. Each entity has one or more planning variables that the solver assigns.
// Shift is a planning entity
DomainClass::new("Shift")
.with_annotation(PlanningAnnotation::PlanningEntity)
.with_field(
// employee is a planning variable - solver decides the value
FieldDescriptor::new("employee", FieldType::object("Employee"))
.with_planning_annotation(PlanningAnnotation::planning_variable(vec!["employees"]))
)
Problem Facts
Objects that provide data but are not modified by the solver.
// Employee is a problem fact - solver reads but doesn't change it
DomainClass::new("Employee")
.with_field(FieldDescriptor::new("name", FieldType::Primitive(PrimitiveType::String)))
.with_field(FieldDescriptor::new("skills", FieldType::list(FieldType::Primitive(PrimitiveType::String))))
Planning Solution
A container that holds all entities and problem facts, plus the score.
DomainClass::new("Schedule")
.with_annotation(PlanningAnnotation::PlanningSolution)
.with_field(/* employees - problem facts */)
.with_field(/* shifts - planning entities */)
.with_field(/* score - optimization result */)
Constraints
Constraints define what makes a solution valid and good.
Hard Constraints
Must be satisfied for a solution to be feasible. Violations result in negative hard score.
// Every shift must have an employee with the required skill
StreamComponent::for_each("Shift"),
StreamComponent::filter(WasmFunction::new("skillMismatch")),
StreamComponent::penalize("1hard/0soft"),
Soft Constraints
Should be satisfied for a better solution. Violations result in negative soft score.
// Prefer balanced shift distribution
StreamComponent::for_each("Shift"),
StreamComponent::group_by(/* ... */),
StreamComponent::penalize("0hard/1soft"),
Score Types
The score measures solution quality. SolverForge supports multiple score types:
| Score Type | Levels | Example |
|---|---|---|
SimpleScore | 1 | -5 |
HardSoftScore | 2 | 0hard/-10soft |
HardMediumSoftScore | 3 | 0hard/0medium/-5soft |
BendableScore | N | Configurable levels |
Score Interpretation
- Hard score = 0: All hard constraints satisfied (feasible)
- Hard score < 0: Hard constraints violated (infeasible)
- Soft score: Higher is better (less negative = fewer soft violations)
Example: 0hard/-5soft is feasible but has 5 soft constraint points violated.
Solving Process
- Initial Solution: Start with planning variables unassigned or randomly assigned
- Move Selection: Choose a move (e.g., assign employee A to shift 1)
- Score Calculation: Evaluate all constraints after the move
- Move Acceptance: Accept or reject based on score improvement
- Termination: Stop when time limit, score limit, or other condition is met
Constraint Streams
Constraints are expressed as pipelines that:
- Select entities:
for_each("Shift") - Filter matches:
filter(predicate) - Join with other entities:
join("Employee") - Group for aggregation:
group_by(key, collector) - Penalize/Reward:
penalize("1hard/0soft")
Example constraint pipeline:
forEach(Shift)
→ filter(unassignedEmployee)
→ penalize(1hard)
This penalizes every shift that has no employee assigned.
Next Steps
- Domain Modeling - Define your planning domain
- Constraints - Build constraint streams